MV/LV Cement transformation cabin 15/0.8kV for photovoltaic system
Cuneo (Italy)
Country
Year
Location
Solutions
Products
Description
We have carried out an STC-Kiosk transformation cabin, destined for a photovoltaic system in the province of Cuneo, in Piedmont.
Our Engineering Hub has designed, constructed and installed an MV/LV 15/0.8kV 1MVA cement transformation cabin, equipped with an air-insulated (AIS) medium-voltage (MV) electrical switchgear ATR 24kV 630A 16kA, low-voltage (LV) Euro-SDS panels, LV disconnector with fuses 800V AC, dry-type elevator transformer, interconnecting cables and auxiliary equipment. This tailor-made project was completed in a few weeks, thanks to the know-how and flexibility of our engineers. To speed up work, we made the roof removable, in order to install the transformer in a second phase.
Related projects to Photovoltaics
Energy and agriculture in synergy with our eHouse
Montalto di Castro (Italy)
We have studied, designed, manufactured and supplied a connection cabin, eHouse, intended for the Guinza Grande plant in Montalto di Castro, Viterbo.
N. 2 MV E-House 24kV and 36kV for photovoltaic plant
Assemini, Loc. Macchiareddu (Italy)
The project was carried out in an electrical substation for the delivery of high voltage (HV) power, situated inside a photovoltaic plant, in one of the most important industrial centres of the southern Sardinia.