E-Houses for BESS 100MW and 50MW-200MWh

Lakeside (UK) and Belgium

Description

eHouse addressed to Tesla BESS plants 100 MW in Lakeside and 50MW-200MWh for Eneco, in Belgium.

Technical features: N. 3 eHouses 33kV STC-Box, each equipped with ATR 36kV 1250A 25kA(1s) protection panels, HVAC system, fire detection system, LV switchboard, UPS panel, patch panel, SCADA system.
Special Features upon the request of the client include:

  • 4G antenna
  • Weather station and GPS
  • SWICOM systems: Monitors breaker drive, temperatures in critical points on primary circuit and partial discharge using an indicator
  • Roxtec Gland Plate
  • PDcom: Partial Discharge Monitoring for switchgears
  • System pro M compact® InSite: smart contacts for low voltage devices

Related projects to SCADA Solution

eHouse for 35MW/70MWh Skeeby BESS

North Yorkshire

Design, manufacturing and supply of a switchroom for the 35MW/70MWh Skeeby Battery Energy Storage System (BESS), located just outside Richmond in North Yorkshire.

HV/MV Mobile Substation 110/20kV 40MVA

Fushë-Krujë (Albania)

Development and supply of a mobile substation 110/20kV for transformation and primary distribution 40MVA, carried out in the geographical area of Fushë-Krujës. It involves the supply of electricity for the benefit of a population of over 40,000 inhabitants.