STC-Skid transformation cabins 4,8MVA

Padua (Italy)

Country

Italy

Year

2023

Description

Design, manufacturing and commissioning of plug-in Skid transformation cabins destined for a photovoltaic plant in the beautiful location of Monselice (Padua).

In detail, the project includes n. 2 Skid cabins 4,8MVA, equipped with MV switchgear ATR-Ring 24kV 630A 16kA, MV/LV oil-transformer, LV/LV auxiliary transformer, low-voltage switchboard Euro PC, UPS panels, AUX panels.

Related projects to Transformation cabin

ISO Container for oil plant

Sirte Bay (Libya)

The project is designed for an oil plant extraction in Libya. It consists of an IP65 ISO container, equipped with an LV switchboard, LV MCC (Motor Control Center), UPS system, HVAC system, LV transformer 480/400VAC, and fire fighting system.

MV/LV Cement transformation cabin 15/0.8kV for photovoltaic system

Cuneo (Italy)

We have carried out an STC-Kiosk transformation cabin, destined for a photovoltaic system in the province of Cuneo, in Piedmont.