STC-Skid transformation cabins 4,8MVA

Padua (Italy)

Country

Italy

Year

2023

Description

Design, manufacturing and commissioning of plug-in Skid transformation cabins destined for a photovoltaic plant in the beautiful location of Monselice (Padua).

In detail, the project includes n. 2 Skid cabins 4,8MVA, equipped with MV switchgear ATR-Ring 24kV 630A 16kA, MV/LV oil-transformer, LV/LV auxiliary transformer, low-voltage switchboard Euro PC, UPS panels, AUX panels.

Related projects to Transformation cabin

Skid transformation cabin 36kV 4.4MVA

Trino Vercellese (Italy)

We have designed, manufactured and carried out the commissioning of STC-Skid transformer substations destined for the Trino Vercellese photovoltaic plant.

MV Trasnformation cabin 36kV for rural areas

Kinshasa (Congo)

The project has included the installation of a prefabricated compact substation for the electrification of Congolese rural areas.