MV EHOUSE 33kV 25MVA AND 49,5MVA FOR BATTERY ENERGY STORAGE SYSTEM

Luton (United Kingdom)

Country

United Kingdom

Year

2023

Description

The project consists in the design, manufacturing, and commissioning of an eHouse in the Chapel farm plant 49,5MW/99MWh near Luton (UK), connected to the Tesla Battery Energy Storage System (BESS).

It includes n. 1 switching station STC-Box , including 36kV 1250A 31.5kA(1s) MV AIS Normal Clad switchgear, LV switchboard Euro SDS, Patch panel Euro P&C, UPS battery, HVAC system, auxiliary equipment, plus provision for a centralized SCADA panel and a DNO interface panel.

Related projects to eHouse

MV E-House 24kV for electrical grid

Quito (Ecuador)

The project aims to increase the electrification grid in Ecuador areas which suffer a lack of electricity.

MV E-Houses 36kV for diesel power plant

Naypyidaw (Myanmar)

The project was carried out in the capital of Myanmar and it has allowed an increase in the supply of electricity in diesel power plants.