N.2 MV E-House 33kV 50MVA for Tesla Battery Energy Storage System

Yorkshire (United Kingdom)

Country

United Kingdom

Year

2022

Description

Design, construction and supply of n. 2 switching stations equipped with power transformers, MV air-insulated ATR switchgear 36kV 1250A 20kA (1s), LV switchboards, and a SCADA system for the remote control, destined to Tesla BESS (Battery Energy Storage System).

The Pillswood e plant in Yorkshire has a total power of 98 MW.
Our switching stations connect the Tesla Megapack to the electrical grid.

Related projects to eHouse

EHOUSE FOR WATER TREATMENT PLANT

We have designed and manufactured a 1600kVA STC-Kiosk transformer cabin

MV E-House 36kV for Artemisa development area

Artemisa (Cuba)

Designed, construction and supply of n. 2 modular, pre-assembled and fully tested STC-Box cabins, for the expansion of a power plant serving the industrial area of Artemisa, in Cuba.