N.2 MV E-House 33kV 50MVA for Tesla Battery Energy Storage System
Yorkshire (United Kingdom)
Country
Year
Description
Design, construction and supply of n. 2 switching stations equipped with power transformers, MV air-insulated ATR switchgear 36kV 1250A 20kA (1s), LV switchboards, and a SCADA system for the remote control, destined to Tesla BESS (Battery Energy Storage System).
The Pillswood e plant in Yorkshire has a total power of 98 MW.
Our switching stations connect the Tesla Megapack to the electrical grid.
Related projects to eHouse
EHOUSE FOR WATER TREATMENT PLANT
We have designed and manufactured a 1600kVA STC-Kiosk transformer cabin
MV E-House 36kV for Artemisa development area
Artemisa (Cuba)
Designed, construction and supply of n. 2 modular, pre-assembled and fully tested STC-Box cabins, for the expansion of a power plant serving the industrial area of Artemisa, in Cuba.