MV E-House 36kV for photovoltaic system

Macchiareddu, Cagliari (Sardinia)

Country

Italy

Year

2022

Description

Plug-in electrical substation, connected to a large photovoltaic system in the industrial district of Macchiareddu (Sardinia), for the implementation of the electrical grid.

Design, construction, and commissioning of a switching station STC-Box, equipped with:

  • MV air-insulated electrical switchgear ATR 36kV 2000A 25kA with rotary line disconnectors
  • LV switchboard Euro-SDS
  • Battery
  • Auxiliary transformer
  • HVAC system
  • Auxiliary equipment
We have also carried out electrical equipment to be integrated into a cement structure:
  • N. 15 ATR switchgear cubicles 36kV 1250A 25kA with rotary line disconnectors
  • LV switchboards Euro SDS
  • Auxiliary transformer
  • Auxiliary equipment
It has been carried out for our sister company CR Project Service SRL, which engaged in the project and in the realization of the new substation of the "BLUSOLAR UNO" photovoltaic plant.

Related projects to eHouse

eHouses for 50MW/100MWh BESS plant

Hilbesheim

Design, manufacturing and supply of a switchroom and a control room for the 50MW/100MWh Battery Energy Storage System destined to La Sarre, in Hilbesheim (France).

N. 2 Transformation cabins and n. 2 switching stations for PV greenhouses

Oristano (Italy)

The project includes the design, manufacturing, and supply of n. 2 Transformation Cabins STC-Box and n. 2 Delivery Cabins for two photovoltaic greenhouse plants, in Oristano (Sardinia).