MV/LV Cement transformation cabin 15/0.8kV for photovoltaic system
Cuneo (Italy)
Country
Year
Location
Solutions
Products
Description
We have carried out an STC-Kiosk transformation cabin, destined for a photovoltaic system in the province of Cuneo, in Piedmont.
Our Engineering Hub has designed, constructed and installed an MV/LV 15/0.8kV 1MVA cement transformation cabin, equipped with an air-insulated (AIS) medium-voltage (MV) electrical switchgear ATR 24kV 630A 16kA, low-voltage (LV) Euro-SDS panels, LV disconnector with fuses 800V AC, dry-type elevator transformer, interconnecting cables and auxiliary equipment. This tailor-made project was completed in a few weeks, thanks to the know-how and flexibility of our engineers. To speed up work, we made the roof removable, in order to install the transformer in a second phase.
Related projects to Photovoltaics
eHouse 33kV for PV plant expansion
Viterbo (Italy)
We have designed, manufactured and supplied an eHouse intended for the expansion of the photovoltaic plant in Montalto di Castro, Italy.
MV/HV EHOUSE 36kV FOR PHOTOVOLTAIC PLANT
Arlena di Castro (Italy)
Design, construction and commissioning of the compact substation STC-Box addressed to the photovoltaic plant in Arlena di Castro (Viterbo), studied to deliver sustainable energy and pave the way towards a greener future.