MV/LV Cement transformation cabin 15/0.8kV for photovoltaic system

Cuneo (Italy)

Country

Italy

Year

2022

Description

We have carried out an STC-Kiosk transformation cabin, destined for a photovoltaic system in the province of Cuneo, in Piedmont.

Our Engineering Hub has designed, constructed and installed an MV/LV 15/0.8kV 1MVA cement transformation cabin, equipped with an air-insulated (AIS) medium-voltage (MV) electrical switchgear ATR 24kV 630A 16kA, low-voltage (LV) Euro-SDS panels, LV disconnector with fuses 800V AC, dry-type elevator transformer, interconnecting cables and auxiliary equipment. This tailor-made project was completed in a few weeks, thanks to the know-how and flexibility of our engineers. To speed up work, we made the roof removable, in order to install the transformer in a second phase.

Related projects to Photovoltaics

Skid transformation cabin 36kV 4.4MVA

Trino Vercellese (Italy)

We have designed, manufactured and carried out the commissioning of STC-Skid transformer substations destined for the Trino Vercellese photovoltaic plant.

MV E-House 24kV for photovoltaic plant

Trecate (Italy)

Tailor-made project for the implementation of electrical equipment interconnected to the new photovoltaic system in Trecate (Novara), committed to us by a large company in the oil & gas field, which will provide green energy to a refinery plant.