Medium-Voltage (MV) ATR Switchgears 36kV 630A 12,5kVA

Addis Ababa (Ethiopia)

Country

Ethiopia

Year

2016

Description

The project has been carried out in Addis Abeba and consists of engineering, construction and supply of n. 2 medium-voltage ATR switchgear cubicles 36kV 630A 12,5kVA for industrial applications.

Related projects

Solar energy for rural communities in Zanzan

Zamou, Solokaye, Kapé, Kromambira, Boudou, Kakpin, Gansé (Ivory Coast)

The project aimed to improve the electrification plan in 7 African villages located in Zanzan region, through the micro-generation based on solar energy.

MV E-House 4.16kV for oil plant

Nafoora (Lybia)

The project includes the design, construction, and commissioning of a compact and modular substation STC-Box and it is addressed to an oil plant in Nafoora, Sirte Bay, in Lybia.