CIRCULAR-ECONOMY PROJECT IN SYRIA

Damasco (Syria)

Country

Syria

Year

2020

Description

Fast-track project of n. 2 ATR electrical switchgears (n. 11 cubicles), aimed to the restart of an important steel plant in Syria.

In line with the circular economy, the project has involved the regeneration and customization of two medium-voltage (MV) air-insulated switchgears ATR 36kV 2500A 25kA. This strategy has allowed both savings in terms of time and costs, and an advantage in environmental terms, avoiding the disposal of the switchgears and their components. It was possible thanks to the combined skills of the commercial, technical, production, and logistics departments that allowed to guarantee to the customer a high-quality product and reliable service, despite the lockdown restrictions.

Related projects

Retrofit of Medium-voltage (MV) circuit-breakers 800A

Dalmine - Bergamo (Italy)

For the realization of the project, the engineering hub has applied a reverse engineering study, starting from the existing plant, to develop an operational and suitable product.

N. 7 MV E-Houses 24kV for generator plants

Guacara e Tucacos (Venezuela)

The project was carried out in Guacara and Tucacas, tourist cities located in Venezuela. It has seen the implementation of several compact substations, destined to Hyundai generator plants.