CIRCULAR-ECONOMY PROJECT IN SYRIA
Damasco (Syria)
Country
Year
Description
Fast-track project of n. 2 ATR electrical switchgears (n. 11 cubicles), aimed to the restart of an important steel plant in Syria.
In line with the circular economy, the project has involved the regeneration and customization of two medium-voltage (MV) air-insulated switchgears ATR 36kV 2500A 25kA. This strategy has allowed both savings in terms of time and costs, and an advantage in environmental terms, avoiding the disposal of the switchgears and their components. It was possible thanks to the combined skills of the commercial, technical, production, and logistics departments that allowed to guarantee to the customer a high-quality product and reliable service, despite the lockdown restrictions.
Related projects
MV Mobile Substation 23kV
Asunción (Paraguay)
Study, design, construction of a mobile substation 23kV composed of two trailers, 17 m each. It will be used for the extension of the electrical substation, and emergency and maintenance needs, in Paraguay.
N.2 MV E-House 33kV 50MVA for Tesla Battery Energy Storage System
Yorkshire (United Kingdom)
Design, construction and supply of n. 2 switching stations equipped with power transformers, MV air-insulated ATR switchgear 36kV 1250A 20kA (1s), LV switchboards, and a SCADA system for the remote control, destined to Tesla BESS (Battery Energy Storage System).