Description

Fast-track project of n. 2 ATR electrical switchgears (n. 11 cubicles), aimed to the restart of an important steel plant in Syria.

In line with the circular economy, the project has involved the regeneration and customization of two medium-voltage (MV) air-insulated switchgears ATR 36kV 2500A 25kA. This strategy has allowed both savings in terms of time and costs, and an advantage in environmental terms, avoiding the disposal of the switchgears and their components. It was possible thanks to the combined skills of the commercial, technical, production, and logistics departments that allowed to guarantee to the customer a high-quality product and reliable service, despite the lockdown restrictions.

Related projects

Medium-Voltage (MV) Switchgears 22kV 630A 25kA and Transformers 320kVA 22/0,4kV

Hai Phong (Vietnam)

Carrying out of switchgears and transformers for the electricity supply in Hai Phong, third Vietnamese city in terms of population and one of the nation’s main ports.

ISO Container for oil plant

Sirte Bay (Libya)

The project is designed for an oil plant extraction in Libya. It consists of an IP65 ISO container, equipped with an LV switchboard, LV MCC (Motor Control Center), UPS system, HVAC system, LV transformer 480/400VAC, and fire fighting system.