CIRCULAR-ECONOMY PROJECT IN SYRIA
Damasco (Syria)
Country
Year
Description
Fast-track project of n. 2 ATR electrical switchgears (n. 11 cubicles), aimed to the restart of an important steel plant in Syria.
In line with the circular economy, the project has involved the regeneration and customization of two medium-voltage (MV) air-insulated switchgears ATR 36kV 2500A 25kA. This strategy has allowed both savings in terms of time and costs, and an advantage in environmental terms, avoiding the disposal of the switchgears and their components. It was possible thanks to the combined skills of the commercial, technical, production, and logistics departments that allowed to guarantee to the customer a high-quality product and reliable service, despite the lockdown restrictions.
Related projects
MV eHouse 33kV 25MVA and 49,5MVA for battery energy storage system
Luton (United Kingdom)
The project consists in the design, manufacturing, and commissioning of an eHouse in the Chapel farm plant 49,5MW/99MWh near Luton (UK), connected to the Tesla Battery Energy Storage System (BESS).
Transformation cabins with ring configuration
Latin America
We have studied, designed, manufactured and delivered the following plug and play modular transformation cabins, STC-Kiosk, with ring configuration.