Electrical installation works for industrial plant

Pieve Vergonte (Italy)

Country

Italy

Year

2020

Description

The project has included the works to expand the high-voltage (HV) electrical substation serving the Hydrochem Srl plant in Pieve Vergonte (Piedmont).

C.R. Technology Systems has supervised and coordinated the team and the activities on site, carried out in record times.
In detail, HV electrical equipment was installed and put into service through a process of energizing the substation in two phases, and it included:

  • Transformers
  • Disconnectors
  • Circuit-breakers
  • Line insulators
  • Surge arresters
  • Portal 2 intermediate
  • Portal 2 Side stalls A and B

Related projects to Electrical substation

MV/MV indoor substation 34.5/13.8kV 10MVA

Matanzas (Cuba)

In the Cuban area of Matanzas, to grant the increasing demand for electricity during the tourist season, we realized an electrical substation that guarantees high technological performances together with a harmonious impact in the landscape context.

HV/MV Substation 110/34.5 kV 25MVA

Artemisa (Cuba)

The project has involved the study, construction and start-up of an electrical substation in the province of Artemisa, in Cuba.