Supply of electrical equipment

Porto Alegre (Brasile)

Country

Brazil

Year

2015

Location
Products
Description

The project, carried out in Porto Alegre in Brazil, has involved the supply of materials and accessories for the assembly of switchgears and electrical equipment.

The project has included overloaded disconnectors 36kV together with the accessories and auxiliary materials needed for the start-up of a plant.

Related projects

CONTROL ROOM EHOUSE FOR BESS 100MW 200MWh

North Yorkshire (United Kingdom)

We designed, constructed and supplied an eHouse control room, carried out for Tesla and addressed to the Lakeside Battery Energy Storage System, in Drax, North Yorkshire (UK).

MV E-House 34.5kV for oil plant

Sirte Bay (Libya)

Extension of the electrical substation serving the oil plant in Nafoora, at Sirte Bay. The project involves the design, construction, and supply of 34.5kV, 4.16kV and 480V compact and modular plug-in substations.