Supply of electrical equipment

Porto Alegre (Brasile)

Country

Brazil

Year

2015

Location
Products
Description

The project, carried out in Porto Alegre in Brazil, has involved the supply of materials and accessories for the assembly of switchgears and electrical equipment.

The project has included overloaded disconnectors 36kV together with the accessories and auxiliary materials needed for the start-up of a plant.

Related projects

Nr 2 eHouse 33kV switching station – Bumper for BESS

Ilmer, Princess Risborough (UK)

We are currently engaged in a new project, involving the construction of two MV Switching stations for an upcoming Battery Energy Storage System (BESS) initiative. These stations will be situated in Severalles Farm, Ilmer, Princess Risborough, UK, supplying 100MWh as storage capacity.

N. 2 eHouses for BESS connected to offshore wind farm

Norwich

The project involves, the engineering design, manufacture and supply of n. 2 plug-in eHouse, STC-Box, 33kV, for Battery Energy Storage System (BESS).