Supply of electrical equipment

Porto Alegre (Brasile)

Country

Brazil

Year

2015

Location
Products
Description

The project, carried out in Porto Alegre in Brazil, has involved the supply of materials and accessories for the assembly of switchgears and electrical equipment.

The project has included overloaded disconnectors 36kV together with the accessories and auxiliary materials needed for the start-up of a plant.

Related projects

eHouse for BESS in Serramanna station

Cagliari (Italy)

We have designed and manufactured a switchroom that will manage the power distribution from a 40MW photovoltaic plant and a 17MW BESS system on a surface of 51 hectares at Serramanna station in Cagliari.

N. 4 Transformation cabins for photovoltaic systems 3.15MW

Pontinia and Montalto (Italy)

Design, construction and commissioning of plug-in compact substations STC-Kiosk for 3.15MW photovoltaic systems in Pontinia and Montalto (Latina).