Protection panels for Electrical Substation

Croydon (United Kingdom)

Country

United Kingdom

Year

2009

Location
Products
Description

The project, carried out in the city of Croydon, a metropolitan center located in south of London, has included the supply of two protection and control panels, the materials and accessories needed for the putting into service. Everything was addressed to an electrical substation 34.5kV 24Vdc with a frequency of 60Hz.