Supply of Electrical Materials for a Photovoltaic Plant
Areza (Eritrea)
Country
Year
Description
The project has been implemented in Areza, a rural area in the south of Eritrea, aimed to supply electrical material for a photovoltaic plant.
It has been installed:
- 13 voltage transformers 200kVA 15000/400/240V;
- 21 voltage transformers 100kVA 15000/415/240V;
- 26 voltage transformers 50kVA 15000/415/240V;
- 30 voltage transformers 25kVA 15000/415/240V.
Related projects
Medium–Voltage (MV) switchgears 36kV for the Expansion of Electrical Substation
Artemisa (Cuba)
In the province of Artemisa, a highly inhabited Cuban region, the supply of medium-voltage switchgears 36kV aimed to expand the electrical substation for the “Zal” logistics activity zone.
HV/MV Substation 110/34.5kV 25MVA
Puerto Escondido (Cuba)
The project has involved the supply of material to increase the high-voltage to medium-voltage electrical substation (HV/MV) in the developing area of Petrolero, in Puerto Escondido district.