Supply of Electrical Materials for a Photovoltaic Plant

Areza (Eritrea)

Country

Eritrea

Year

2018

Location
Products
Description

The project has been implemented in Areza, a rural area in the south of Eritrea, aimed to supply electrical material for a photovoltaic plant.

It has been installed:

  • 13 voltage transformers 200kVA 15000/400/240V;
  • 21 voltage transformers 100kVA 15000/415/240V;
  • 26 voltage transformers 50kVA 15000/415/240V;
  • 30 voltage transformers 25kVA 15000/415/240V.
In addition, the project has included over n. 6000 circuit breakers, n. 170 disconnectors and various types of cables and connectors. The n. 2 viallges in Aresa and Maidma have been interconnected to n. 2 photovoltaic plants of total power 2.7MWp.

Related projects

Medium–Voltage (MV) switchgears 36kV for the Expansion of Electrical Substation

Artemisa (Cuba)

In the province of Artemisa, a highly inhabited Cuban region, the supply of medium-voltage switchgears 36kV aimed to expand the electrical substation for the “Zal” logistics activity zone.

HV/MV Substation 110/34.5kV 25MVA

Puerto Escondido (Cuba)

The project has involved the supply of material to increase the high-voltage to medium-voltage electrical substation (HV/MV) in the developing area of ​​Petrolero, in Puerto Escondido district.