N. 11 eHouses and 1 control room for BESS
Eccles (United Kingdom)
Country
Year
Description
N. 11 switchrooms and 1 control room for a major 400MW BESS (Battery Energy Storage System) project in Eccles, United Kingdom.
It includes:
- N. 11 Switchrooms 33kV: equipped with MV switchgear, LV protection and control panels, HVAC systems, rectifiers, integrated fire detection and automatic suppression systems.
- N. 1 BESS Control Room: featuring HVAC systems, LV protection and control panels, rectifiers, dedicated fire detection and automatic suppression system.
A key highlight of this project is the fire suppression system within the switchrooms, strictly engineered according to UK standards for hazardous areas.
To meet the client’s specific requirements, we integrated strategic partnerships with external specialists into our workflow. This collaboration ensures cutting-edge fire safety, including specialized piping systems for rapid flame suppression.
Related projects to eHouse
MV eHouse 33kV 25MVA and 49,5MVA for battery energy storage system
Luton (United Kingdom)
The project consists in the design, manufacturing, and commissioning of an eHouse in the Chapel farm plant 49,5MW/99MWh near Luton (UK), connected to the Tesla Battery Energy Storage System (BESS).
N. 2 MV E-House 24kV and 36kV for photovoltaic plant
Assemini, Loc. Macchiareddu (Italy)
The project was carried out in an electrical substation for the delivery of high voltage (HV) power, situated inside a photovoltaic plant, in one of the most important industrial centres of the southern Sardinia.