N. 7 MV E-Houses 24kV for generator plants
Guacara e Tucacos (Venezuela)
Country
Year
Description
The project was carried out in Guacara and Tucacas, tourist cities located in Venezuela. It has seen the implementation of several compact substations, destined to Hyundai generator plants.
The project has included the design, implementation, and supply of electrical equipment, addressed to two different areas:
- In Guacara were supplied n. 4 STC-Box shelters, with Normal Clad cubicles 13.8kV 2000A 31.5kA, with a frequency of 60Hz for the diesel power station consisting of n. 56 units 1700kW each.
- In the city of Tucacas, were supplied n. 3 STC-Box shelters, with Normal Clad cubicles 13.8kV 2000A 31.5kA, with a frequency of 60Hz for the diesel power station consisting of n. 48 units 1700kW each. Ul>
Related projects to eHouse
EHOUSE 36kV 42MW BESS PLANT
Hyde (United Kingdom)
We have delivered our eHouse, STC-Box 33kV type, addressed to a Battery Energy Storage System, located in Hyde (UK).
N.2 MV E-House 33kV 50MVA for Tesla Battery Energy Storage System
Yorkshire (United Kingdom)
Design, construction and supply of n. 2 switching stations equipped with power transformers, MV air-insulated ATR switchgear 36kV 1250A 20kA (1s), LV switchboards, and a SCADA system for the remote control, destined to Tesla BESS (Battery Energy Storage System).