N. 4 switching station and n. 1 control room for BESS

Cernay-lès-Reims (France)

Country

Francia

Year

2025

Description

Installation will feature 240MW/480MWh of storage capacity and will be connected to the 225kV RTE national grid.

The project contributes to France’s largest Battery Energy Storage System (BESS) and is designed to store enough energy to cover 20% of the residential electricity needs of the Marne department (≈565,000 residents) and will play a key role in stabilizing the grid as renewable energy penetration increases.
It includes the study, deign, manufacturing and delivery of n. 4 switching station and n. 1 control room. The equipment includes:

  • MV switchgear ATR 33kV 2500A 25kA(1s)
  • LV switchboard
  • Patch panel
  • HV bus and interface protection panel Euro-P&C
  • Fire detection system
  • HVAC
  • UPS and rectifier
  • 4G antenna, weather station, GPS, Swicom
  • SCADA panels
  • Roxtech

Related projects to eHouse

Energy and agriculture in synergy with our eHouse

Montalto di Castro (Italy)

We have studied, designed, manufactured and supplied a connection cabin, eHouse, intended for the Guinza Grande plant in Montalto di Castro, Viterbo.

MV E-House 13.8kV for electrical grid

Puerto Cabello (Venezuela)

The project has included modular shelters and medium and low-voltage switchgears, for the modernization of generators in Venezuela.