eHouse 33kV for PV plant expansion

Viterbo (Italy)

Country

Italy

Year

2024

Description

We have designed, manufactured and supplied an eHouse intended for the expansion of the photovoltaic plant in Montalto di Castro, Italy.

The compact electrical substation is equipped with a MV switchgear ATR 30kV 2000A 20kA, HVAC, fiscal meter, UPS, die-cast resin transformer, LV switchboards Euro-SDS, auxiliary equipment. This substation project is a significant initiative for the integration of photovoltaic energy into the local electricity grid. This project involves the construction of a substation that will transform the energy generated by solar panels into energy usable for distribution.

Related projects to eHouse

N. 4 switching station and n. 1 control room for BESS

Cernay-lès-Reims (France)

Installation will feature 240MW/480MWh of storage capacity and will be connected to the 225kV RTE national grid.

MV E-House 20kV for photovoltaic plant

Cipollaretta (Italy)

Design and construction of an E-House, for the Alzo electrical substation, carried out by our Sister Company C.R. Project Service. It is connected to the largest photovoltaic system in the Viterbo area and occupies 101 hectares in the Cipollaretta area.