Supply of equipment for Electrical Plant
Cairo (Egypt)
Country
Year
Description
The project was addressed to the Egyptian capital Cairo and it has seen the supply of electrical equipment and cables for the expansion of an electrical system.
Moreover, it has included a UPS (Uninterruptible Power Supply) with a power of 15kVA.
Related projects
Nr 2 eHouse 33kV switching station – Bumper for BESS
Ilmer, Princess Risborough (UK)
We are currently engaged in a new project, involving the construction of two MV Switching stations for an upcoming Battery Energy Storage System (BESS) initiative. These stations will be situated in Severalles Farm, Ilmer, Princess Risborough, UK, supplying 100MWh as storage capacity.
eHouse 33kV for BESS in Lancashire
Chorley (United Kingdom)
Design, construction and delivery of an eHouse destined to the BESS systems connected to a photovoltaic plant in Chorley, Lancashire (UK), with the aim of powering the local grid.
