MV E-Houses 36kV for diesel power plant
Naypyidaw (Myanmar)
Country
Year
Description
The project was carried out in the capital of Myanmar and it has allowed an increase in the supply of electricity in diesel power plants.
It has included the design, construction and installation of two STC-Box shelters 36kV 1000A 31,5kA containing medium-voltage (MV) metal-enclosed ATR switchgears, counting with a total of 23 columns. The two shelters have been designed and sized in order to transmit a nominal power of 70MVA on the grid. The solution has been created with the aim of distributing large power generated without availing of gas-insulated switchgears (GIS).
Related projects to eHouse
eHouse 33kV for PV plant expansion
Viterbo (Italy)
We have designed, manufactured and supplied an eHouse intended for the expansion of the photovoltaic plant in Montalto di Castro, Italy.
N. 4 MV E-Houses 23kV for electrification of rural areas
Gonaives e Cabo Haitiano (Haiti)
The project has included n. 4 compact substations, with the aim to supply the electricity in the rural areas of Gonaives and Cabo Haitiano.