MV E-House 35/20/10kV for industrial district

Peshkopi (Dibër) - Albania

Country

Albania

Year

2014

Description

Design, construction and supply of a medium-voltage (MV) compact substation in Peshkopi, industrial area of the Albanian city Dibër.

The project has involved the design and implementation of a compact substation STC-Box 35/20/10kV, which includes medium-voltage metal-enclosed ATR switchgears 12kV, 24kV and 39kV, an auxiliary transformer, a low-voltage (LV) switchgear 400V 160A 10kA, power transformer 12MVA 35/20/10kV, DC system, earthing system and auxiliary services.

Related projects to eHouse

EHouse and n. 4 transformation cabins for Photovoltaic plant

Macchiareddu (Italy)

Project realised in Macchiareddu, within a photovoltaic park in Sardinia in one of the most important industrial hubs. This is an area of development increasingly powered by alternative energy, where CR Technology Systems has already been present for some years in the realisation of green projects in the area.

MV E-House 20kV for photovoltaic plant

Cipollaretta (Italy)

Design and construction of an E-House, for the Alzo electrical substation, carried out by our Sister Company C.R. Project Service. It is connected to the largest photovoltaic system in the Viterbo area and occupies 101 hectares in the Cipollaretta area.