N. 6 Photovoltaic Plants for a total power of 10MW
Latin America
Country
Year
Location
Solutions
Products
Description
It is the first major project concerning 6 photovoltaic plants distributed in five different provinces, which has the function of reducing CO2 emissions and safeguarding the surrounding environment, threatened by the increasing rate of tourism.
Construction of 6 photovoltaic plants distributed as follows:
- 2.5 MW, n.10.160 of photovoltaic modules, with a total power of 2.540kWp, medium-voltage ATR switchgears 36kV, STC-Box Solar Station 2.000 and STC-Box Solar Station 500, SCADA system, inverter.1
- 3 MW, n. of 12.000 photovoltaic modules, with a total power of 3.000kWp, medium-voltage ATR switchgears 36kV, STC-Box Solar Station 1.000 and STC-Box Solar Station 2.000, SCADA system, inverter.
- 2 MW, n. 8.000 of photovoltaic modules, with a total power of 2.000kWp, medium-voltage ATR switchgears 24kV, STC-Box Solar Station 2.000 cabin, SCADA system, inverter.
- 1 MW, n. 4.000 of photovoltaic modules, with a total power of 1.000kWp, medium-voltage ATR switchgears 24kV, STC-Box Solar Station 1.000, SCADA system, inverter.
- 1MW, n. 4.000 of photovoltaic modules, with a total power of 1.000kWp, medium-voltage ATR switchgears 36kV, STC-Box Solar Station 1.000, SCADA system, inverter.2
- 500KW, n. 2.080 of photovoltaic modules, with a total power of 520kWp, medium voltage ATR switchgears 36kV, STC-Box 500-1.000 solar station, SCADA system, inverter.
Related projects to Photovoltaics
STC-SKID transformation cabins 6MVA et 4MVA
Bucharest (Romania)
Design, manufactoring and commissioning of n. 3 STC-Skid plug-in substations for a photovoltaic system in Romania.
N. 2 Transformation cabins and n. 2 switching stations for PV greenhouses
Oristano (Italy)
The project includes the design, manufacturing, and supply of n. 2 Transformation Cabins STC-Box and n. 2 Delivery Cabins for two photovoltaic greenhouse plants, in Oristano (Sardinia).