MV/HV EHOUSE 36kV FOR PHOTOVOLTAIC PLANT

Arlena di Castro (Italy)

Description

Design, construction and commissioning of the compact substation STC-Box addressed to the photovoltaic plant in Arlena di Castro (Viterbo), studied to deliver sustainable energy and pave the way towards a greener future.

Our cutting-edge solution includes the following features:

  • MV air-insulated switchgear ATR 36kV 2000A 16kA
  • LV switchboard Euro SDS
  • Auxiliary transformer 100kVA
  • SCADA system with UPDM and Protection panels
  • HVAC plant
Italy's unwavering commitment to a sustainable future is demonstrated through its continuous investments in developing and expanding photovoltaic plants and renewable energy systems, propelling the nation towards a greener tomorrow.

Related projects to Compact substation

eHOUSE: the smart solution for energy distribution

Latin America

We have designed and manufactured n. 5 compact plug-in substations for MV and LV electricity distribution at a territorial level, primarily designed for hotel facilities. The cabins are part of a unified MV distribution system with a double-ring configuration.

MAINTENANCE AT GEWISS LOGISTICS-TECHNOLOGICAL HUB

Calcinate (Italy)

Maintenance plan at Gewiss headquarters in Calcinate (Bergamo). Specifically, it is a lighting efficiency intervention outside the plant.