Description

The project consists in the design, manufacturing, and commissioning of an eHouse in the Chapel farm plant 49,5MW/99MWh near Luton (UK), connected to the Tesla Battery Energy Storage System (BESS).

It includes n. 1 switching station STC-Box , including 36kV 1250A 31.5kA(1s) MV AIS Normal Clad switchgear, LV switchboard Euro SDS, Patch panel Euro P&C, UPS battery, HVAC system, auxiliary equipment, plus provision for a centralized SCADA panel and a DNO interface panel.