MV eHouse 33kV 25MVA and 49,5MVA for battery energy storage system
Luton (United Kingdom)
Country
Year
Description
The project consists in the design, manufacturing, and commissioning of an eHouse in the Chapel farm plant 49,5MW/99MWh near Luton (UK), connected to the Tesla Battery Energy Storage System (BESS).
It includes n. 1 switching station STC-Box , including 36kV 1250A 31.5kA(1s) MV AIS Normal Clad switchgear, LV switchboard Euro SDS, Patch panel Euro P&C, UPS battery, HVAC system, auxiliary equipment, plus provision for a centralized SCADA panel and a DNO interface panel.
Related projects to eHouse
Photovoltaic 86.16MWp
Monreale (Italy)
Project for the photovoltaic plant in Monreale (Palermo), with a capacity of 86.16 MWp.
HV/MV Mobile substation 115/37.5/10.5kV 10MVA
Udënisht, Korçë (Albania)
The project has included design, installation and supply of a mobile substation in Udënisht, a well-known touristic area, in Korçë, and the sixth most important town in Albania.