MV E-HOUSE 33kV 20MVA FOR BESS

Surrey (United Kingdom)

Country

United Kingdom

Year

2023

Description

Design, manufacturing and commissioning of Switching station STC-Box 33kV 20MVA, designed for the BESS plant 20 MW/40 MWh in Farnham, Surrey (UK).

The plug-in modular eHouse, supplied to TESLA, is equipped with:

  • MV switchgear ATR 36kV 630A 25kA
  • LV switchboard Euro-SDS
  • DC system 110 VDC
  • AC/AC UPS
  • Weather Station
  • Patch Panel
  • HVAC system
With the STC-Box, we are redefining the standards of switching stations, offering enhanced functionality, reliability, and ease of operation for Battery energy storage systems (BESS), which are used to store energy from renewable plants for later use during critical periods. The advantages of these systems include cost savings, clean energy and reduced downtime.
Credit picture: Harmony Energy

Related projects to eHouse

eHouse 33kV for BESS in Lancashire

Chorley (United Kingdom)

Design, construction and delivery of an eHouse destined to the BESS systems connected to a photovoltaic plant in Chorley, Lancashire (UK), with the aim of powering the local grid.

CONTROL ROOM EHOUSE FOR BESS 100MW 200MWh

North Yorkshire (United Kingdom)

We designed, constructed and supplied an eHouse control room, carried out for Tesla and addressed to the Lakeside Battery Energy Storage System, in Drax, North Yorkshire (UK).