Medium-Voltage (MV) Switchgears 24kV 2000A 16kA for Photovoltaic plants

Montalto di Castro (Italy)

Description

The project was carried out in Montalto di Castro, in Viterbo, a well-known location as one of the largest solar photovoltaic plant in Italy.

Installation of n. 2 air-insulated (AIS) medium-voltage metal clad cubicles 20kV 2000A 16kA and n. 5 air-insulated medium-voltage metal-enclosed ATR cubicles 24kV 2000A 16kA and a medium-voltage cable ARE4H5E 12/20 1x240 for a centralized supply of five photovoltaic plants in this area (Vivaldi, Verdi, Puccini, Rossini and Paganini).

Related projects

STC-Skid transformation cabins 4,8MVA

Padua (Italy)

Design, manufacturing and commissioning of plug-in Skid transformation cabins destined for a photovoltaic plant in the beautiful location of Monselice (Padua).

Our eHouse for BESS in Lincolnshire

Lincolnshire (United Kingdom)

We projected, manufactured and supplied a switchroom, designed to improve the energy infrastructure in the UK: the supply of a fully equipped 33kV Switchroom STC-Box for a Battery Energy Storage System (BESS) located in Grimsby, Lincolnshire.