Medium-Voltage (MV) Switchgears 24kV 2000A 16kA for Photovoltaic plants

Montalto di Castro (Italy)

Description

The project was carried out in Montalto di Castro, in Viterbo, a well-known location as one of the largest solar photovoltaic plant in Italy.

Installation of n. 2 air-insulated (AIS) medium-voltage metal clad cubicles 20kV 2000A 16kA and n. 5 air-insulated medium-voltage metal-enclosed ATR cubicles 24kV 2000A 16kA and a medium-voltage cable ARE4H5E 12/20 1x240 for a centralized supply of five photovoltaic plants in this area (Vivaldi, Verdi, Puccini, Rossini and Paganini).

Related projects

Skid transformation cabin 36kV 4.4MVA

Trino Vercellese (Italy)

We have designed, manufactured and carried out the commissioning of STC-Skid transformer substations destined for the Trino Vercellese photovoltaic plant.

STC-Skid transformation cabins 20kV

Rovigo (Italy)

The project consists of n. 6 STC-Skid transformation cabins 7.2MW addressed to a photovoltaic system in Rovigo (Italy).