MAINTENANCE AT GEWISS LOGISTICS-TECHNOLOGICAL HUB
Calcinate (Italy)
Country
Year
Description
Maintenance plan at Gewiss headquarters in Calcinate (Bergamo). Specifically, it is a lighting efficiency intervention outside the plant.
Overall, the project includes:
- N. 60 projectors on 10 light towers 32 meters high
- N. 30 road poles perimeter to the plant
- Replacement of lighting bodies on the various signs
- N. 35 lighting bodies on steel stretches for lighting between the various warehouse bodies
- Energy maintenance works for restoring old plants, using materials provided by Gewiss;
- Monitoring of plants and cleaning of electrical shelters;
- Replacement with new lighting fixtures in light towers, located in the forecourt;
- Requalification and management of entrance guard systems;
- Replacement of medium-voltage circuit-breakers;
- Retrofit of swtichgears.
Related projects to Compact substation
eHouse for Continosa PV and wind plant 90MVA
Macchiareddu (Italy)
Design, manufacture, and supply of our eHouse, the Switching Station STC-Box for the in the Continosa photovoltaic (PV) and wind park 90MVA, within the industrial area of Macchiareddu (Sardinia).
Energy and agriculture in synergy with our eHouse
Montalto di Castro (Italy)
We have studied, designed, manufactured and supplied a connection cabin, eHouse, intended for the Guinza Grande plant in Montalto di Castro, Viterbo.