eHouse for BESS in Serramanna station
Cagliari (Italy)
Country
Year
Description
We have designed and manufactured a switchroom that will manage the power distribution from a 40MW photovoltaic plant and a 17MW BESS system on a surface of 51 hectares at Serramanna station in Cagliari.
This unit is equipped with:
- MV switchgear ATR 30kV 1250A 25kA(1s)
- LV switchboard Euro-SDS
- SCADA panel
- Firefighting system & HVAC
The plant will have a total capacity of 38.79 MWp, divided into two subfields equipped with single-axis tracking structures. The project includes integration with a 17 MW electrochemical storage system, which will help stabilize production and optimize grid injection. Overall, the maximum expected injection into the National Transmission Grid (RTN) will be 33MW.
Related projects to eHouse
N. 3 e-Houses for Gallitello substation 30/220kV
Gibellina (Italy)
Design, manufacturing and supply of n. 3 switchrooms for Gallitello connection substation 30/220kV in Gibellina area. It is an essential element for strengthening the region’s energy resilience and integrating renewable energy sources into the Sicilian national transmission grid.
N. 4 Switchrooms and n. 1 control room for BESS
Norwich (United Kingdom)
Design, manufacturing and delivery of n. 4 switchrooms and n. 1 control room for Battery Energy Storage System - BESS, in Norwich (UK).