eHouse 33kV for Oil & Gas plant

North Africa

Country

Libya

Year

2025

Description

We have designed, constructed and supplied n. 7 plug-in eHouses 33kV IP54 equipped with MV switchgear 33kV 1250A and 1600A 25kA, LV switchboard, UPS, fire system, HVAC system, auxiliary equipment.

These compact substations are bound for an Oil & gas project in North Africa and represent one of the largest single-block substation plants ever built.

Related projects to eHouse

MV E-House 36kV for electrical grid

Tripoli (Libya)

The project has included the design and construction of n. 3 compact STC-Box substations, aiming to increase electrification in Libya.

N. 2 MV E-House 24kV and 36kV for photovoltaic plant

Assemini, Loc. Macchiareddu (Italy)

The project was carried out in an electrical substation for the delivery of high voltage (HV) power, situated inside a photovoltaic plant, in one of the most important industrial centres of the southern Sardinia.