eHouse 33kV for Oil & Gas plant

North Africa

Country

Libya

Year

2025

Description

We have designed, constructed and supplied n. 7 plug-in eHouses 33kV IP54 equipped with MV switchgear 33kV 1250A and 1600A 25kA, LV switchboard, UPS, fire system, HVAC system, auxiliary equipment.

These compact substations are bound for an Oil & gas project in North Africa and represent one of the largest single-block substation plants ever built.

Related projects to eHouse

Switchroom and TSO for BESS in France

Cheviré, Nantes (France)

Our eHouse is destined to the largest Battery Energy Storage Systems (BESS) ever built, in the Port of Nantes Saint-Nazaire.

MV Mobile Substation 23kV

Asunción (Paraguay)

Study, design, construction of a mobile substation 23kV composed of two trailers, 17 m each. It will be used for the extension of the electrical substation, and emergency and maintenance needs, in Paraguay.