CONTROL ROOM EHOUSE FOR BESS 100MW 200MWh

North Yorkshire (United Kingdom)

Country

United Kingdom

Year

2024

Description

We designed, constructed and supplied an eHouse control room, carried out for Tesla and addressed to the Lakeside Battery Energy Storage System, in Drax, North Yorkshire (UK).

This advanced energy facility boasts a capacity of 100MW and 200MWh, representing a significant leap forward in energy management and distribution.
The STC-Box control room is equipped with the following state-of-the-art systems and equipment:

  • HVAC and fire detection systems
  • HV protection panel
  • LV Euro P&C panels
  • Marshalling panel
  • Mimic panel
  • RTU panel and 4G antenna
With these features, our eHouse Control Room supports efficient energy management and ensures the highest levels of safety and reliability.

Related projects to Transformation cabin

MV/LV Cement transformation cabin 15/0.8kV for photovoltaic system

Cuneo (Italy)

We have carried out an STC-Kiosk transformation cabin, destined for a photovoltaic system in the province of Cuneo, in Piedmont.

MV E-House 24kV for photovoltaic plant

Trecate (Italy)

Tailor-made project for the implementation of electrical equipment interconnected to the new photovoltaic system in Trecate (Novara), committed to us by a large company in the oil & gas field, which will provide green energy to a refinery plant.