Lighting system

Capo Bon, Korba, Sbikha, Sbeitla e Feriana di Scogat (Tunisia)

Country

Tunisia

Year

2016

Description

The project has included the dismantling of old lighting fixtures and the installation of more technological lamps, aimed at optimizing the lighting system in the areas of Capo Bon, Korba, Sbikha, Sbeitla and Feriana of Scogat, in Tunisia.

Design, realization and supply of LED lamps 160W 60Hz linked to the junction box located at the base of the pole. Projectors have also been installed on the pole arm. The solution has been provided with plug & play formula.

Related projects

MV eHouse 33kV 25MVA and 49,5MVA for battery energy storage system

Luton (United Kingdom)

The project consists in the design, manufacturing, and commissioning of an eHouse in the Chapel farm plant 49,5MW/99MWh near Luton (UK), connected to the Tesla Battery Energy Storage System (BESS).

Medium-Voltage (MV) Normal Clad Switchgears 36kV and 12kV 2500-4000A 40kA (3s)

Basra (Iraq)

Design, construction and start-up of medium-voltage switchgears for the primary distribution aimed to increase the electrification of the Iraqi national grid, in order to guarantee high-reliability and continuity of service.