Lighting system
Capo Bon, Korba, Sbikha, Sbeitla e Feriana di Scogat (Tunisia)
Country
Year
Description
The project has included the dismantling of old lighting fixtures and the installation of more technological lamps, aimed at optimizing the lighting system in the areas of Capo Bon, Korba, Sbikha, Sbeitla and Feriana of Scogat, in Tunisia.
Design, realization and supply of LED lamps 160W 60Hz linked to the junction box located at the base of the pole. Projectors have also been installed on the pole arm. The solution has been provided with plug & play formula.
Related projects
N. 6 Medium-Voltage (MV) Metal-Enclosed ATR Switchgears
Dubai (United Arab Emirates)
The project, carried out in Dubai, capital of the United Arab Emirates, has included the construction and supply n. 6 medium-voltage metal-enclosed ATR switchgear cubicles 24kV 630A 16kA, equipped with signal lamps, pressure gauge and auxiliary accessories.
Medium-Voltage (MV) Normal Clad Switchgears 36kV and 12kV 2500-4000A 40kA (3s)
Basra (Iraq)
Design, construction and start-up of medium-voltage switchgears for the primary distribution aimed to increase the electrification of the Iraqi national grid, in order to guarantee high-reliability and continuity of service.