Description

Design, manufacture and supply of eHouses for BESS plant 68 MW. The battery will contribute to cutting emissions and utilising more renewables on the islands.

For this remote and beautiful area, we have studied, designed manufactured and supplied:
- N. 1 main switchroom 33kV, equipped with medium voltage air-insultaed switchgear, protection panels, HVAC systems, fire detection and automatic extinguisher system, inverter and UPS 110VDC.
- N. 1 control room, equipped with low votlage switchboard, protection panels, HVAC system, fire detection and automatic exhstinguisher system, inverter and UPS 230VAC, marshalling panel, interface panels. - N. 2 LV AC rooms, equipped with low votlage switchboard, protection panels, HVAC system, fire detection and automatic exhstinguisher system, inverter and UPS, marshalling panel, interface panels.
The greatest challenge of this project was the transport, especially the docking in a port not used to receive large cargos. We are proud to have successfully delivered the eHouses. Credit picture landscape: Zenobē Energy Ltd

Related projects to eHouse

eHouse for BESS 100 MW/200 MWh in France

Ferrières-Haut-Clocher

Design, manufacturing and supply a switchroom 33kV and a control room for the Foriaux BESS project for Ferrières-Haut-Clocher, in France.

eHouse for BESS in Serramanna station

Cagliari (Italy)

We have designed and manufactured a switchroom that will manage the power distribution from a 40MW photovoltaic plant and a 17MW BESS system on a surface of 51 hectares at Serramanna station in Cagliari.