MV E-HOUSE 33kV 20MVA FOR BESS
Surrey (United Kingdom)
Country
Year
Description
Design, manufacturing and commissioning of Switching station STC-Box 33kV 20MVA, designed for the BESS plant 20 MW/40 MWh in Farnham, Surrey (UK).
The plug-in modular eHouse, supplied to TESLA, is equipped with:
- MV switchgear ATR 36kV 630A 25kA
- LV switchboard Euro-SDS
- DC system 110 VDC
- AC/AC UPS
- Weather Station
- Patch Panel
- HVAC system
Credit picture: Harmony Energy
Related projects to eHouse
N. 3 e-Houses for Gallitello substation 30/220kV
Gibellina (Italy)
Design, manufacturing and supply of n. 3 switchrooms for Gallitello connection substation 30/220kV in Gibellina area. It is an essential element for strengthening the region’s energy resilience and integrating renewable energy sources into the Sicilian national transmission grid.
N. 2 MV E-Houses for the most powerful turbine in Europe
Marghera Levante (Italy)
The challenging project has included the design, construction, and commissioning of n. 2 e-Houses for the port area of Marghera Levante (Venice).