MV E-HOUSE 33kV 20MVA FOR BESS

Surrey (United Kingdom)

Country

United Kingdom

Year

2023

Description

Design, manufacturing and commissioning of Switching station STC-Box 33kV 20MVA, designed for the BESS plant 20 MW/40 MWh in Farnham, Surrey (UK).

The plug-in modular eHouse, supplied to TESLA, is equipped with:

  • MV switchgear ATR 36kV 630A 25kA
  • LV switchboard Euro-SDS
  • DC system 110 VDC
  • AC/AC UPS
  • Weather Station
  • Patch Panel
  • HVAC system
With the STC-Box, we are redefining the standards of switching stations, offering enhanced functionality, reliability, and ease of operation for Battery energy storage systems (BESS), which are used to store energy from renewable plants for later use during critical periods. The advantages of these systems include cost savings, clean energy and reduced downtime.
Credit picture: Harmony Energy

Related projects to eHouse

N. 2 eHouses for BESS connected to offshore wind farm

Norwich

The project involves, the engineering design, manufacture and supply of n. 2 plug-in eHouse, STC-Box, 33kV, for Battery Energy Storage System (BESS).

HV/MV Mobile substation 115/37.5/10.5kV 10MVA

Udënisht, Korçë (Albania)

The project has included design, installation and supply of a mobile substation in Udënisht, a well-known touristic area, in Korçë, and the sixth most important town in Albania.