Extension of the electrical substation serving the oil plant in Nafoora, at Sirte Bay. The project involves the design, construction, and supply of 34.5kV, 4.16kV and 480V compact and modular plug-in substations.
Carrying out n. 11 compact substations STC-Box on raised basement, connected to n. 4 oil extraction plants and equipped with:
- Air-insulated MV switchgear Normal Clad 12kV and 36kV 1250A 31.5kA (n. 56 cubicles in total)
- LV switchboards, Euro-SDS type
- RTU panels for remote control and communication
- Transformers
- Surge arresters
- HVAC installation
- Fire-fighting system
- SCADA system
- Auxiliary equipment
Considering the project destination, a Libyan desert area, all the equipment is well sealed and protected against dust, corrosion and high temperatures, typical of this region. Moreover, materials and coating used have been studied with the aim of preserving the electrical cabins over time.
Related projects to eHouse
Normal Clad switchgear for electrical power grid
Latin America
Design, manufacturing and supply of n. 24 MV AIS Normal Clad cubicles 13.8kV 2500A 25kA equipped with our wireless and battey-less PR.E.SE. (PRedictive Electrical SEnsors), Power transformers 110kV/34,5kV 28/40MVA with ONAN/ONAF, Power Transformer Protection panel, and customized SCADA system.
MV E-House 20kV for photovoltaic plant
Cipollaretta (Italy)
Design and construction of an E-House, for the Alzo electrical substation, carried out by our Sister Company C.R. Project Service. It is connected to the largest photovoltaic system in the Viterbo area and occupies 101 hectares in the Cipollaretta area.