MV E-House 20kV for Tesla Battery Energy Storage System
West Sussex (United Kingdom)
Country
Year
Description
Engineering study, design, construction, and supply of n. 1 compact substation STC-Box for a Tesla project in West Sussex (UK).
The big E-House has a length of 11 meters and is equipped with n. 7 medium-voltage (MV) air-insulated ATR cubicles 36kV 800A 17.5kA (1s), low-voltage (LV) switchboard Euro-SDS, interconnection cable, RTU panel, power and auxiliary transformer 50kVA, metering system, HVAC system. ATR switchgear got the IAC 20kA (1s) certification, moreover, it includes internal arc protection sensors, in order to ensure a rapid extinguishing in the event of an arc.
Related projects to eHouse
Agrivoltaic: Energy and agriculture in synergy
Montalto di Castro (Viterbo)
Switchroom eHouse designed and manufactured for the Guinza Grande plant in Montalto di Castro, Viterbo.
eHOUSE: the smart solution for energy distribution
Latin America
We have designed and manufactured n. 5 compact plug-in substations for MV and LV electricity distribution at a territorial level, primarily designed for hotel facilities. The cabins are part of a unified MV distribution system with a double-ring configuration.
