Description

Engineering study, design, construction, and supply of n. 1 compact substation STC-Box for a Tesla project in West Sussex (UK).

The big E-House has a length of 11 meters and is equipped with n. 7 medium-voltage (MV) air-insulated ATR cubicles 36kV 800A 17.5kA (1s), low-voltage (LV) switchboard Euro-SDS, interconnection cable, RTU panel, power and auxiliary transformer 50kVA, metering system, HVAC system. ATR switchgear got the IAC 20kA (1s) certification, moreover, it includes internal arc protection sensors, in order to ensure a rapid extinguishing in the event of an arc.

Related projects to eHouse

N. 3 e-Houses for agrivoltaic plants

Naples

N. 3 switchrooms for the agrivoltaic park in Giugliano (Naples), with a total nominal power of 86.63 MW and an annual clean energy production of over 130 GWh. This will supply electricity to 48,000 households, avoiding the emission of more than 60,000 tons of COâ‚‚ and improving crop yield and productivity.

MV E-House 34.5kV for oil plant

Sirte Bay (Libya)

Extension of the electrical substation serving the oil plant in Nafoora, at Sirte Bay. The project involves the design, construction, and supply of 34.5kV, 4.16kV and 480V compact and modular plug-in substations.