Medium-Voltage (MV) Metal Clad switchgears 12kV 2500A 25kA
Santa Cruz de la Sierra, Andrés Ibáñez (Bolivia)
Country
Year
Description
The ambitious project has been destined to a cement factory in Santa Cruz de la Sierra, in Andrés Ibáñez, the largest city in Bolivia.
The project includes the design and installation of n. 30 medium-voltage metal-clad switchgear cubicles 12kV 2500A 25kA, equipped with gas-insulated circuit breakers, placed on a raised modular basement, with the advantage of being easily assembling on site.
Related projects
N. 4 MV E-Houses 23kV for electrification of rural areas
Gonaives e Cabo Haitiano (Haiti)
The project has included n. 4 compact substations, with the aim to supply the electricity in the rural areas of Gonaives and Cabo Haitiano.
eHouses for thermoelectric power plant
Chieti (Italy)
Design, construction and supply of n. 2 plug-in cabins for the Thermoelectric Power Plant in Chieti, Italy.