N. 4 MV E-Houses 23kV for electrification of rural areas

Gonaives e Cabo Haitiano (Haiti)

Country

Haiti

Year

2006

Description

The project has included n. 4 compact substations, with the aim to supply the electricity in the rural areas of Gonaives and Cabo Haitiano.

It has involved the study, construction, and supply of n. 4 STC-Box compact substations, each containing n. 10 medium-voltage (MV) metal enclosed ATR switchgear cubicles 23kV 630A 25kA (1s), with a frequency of 60Hz, current transformers, SCADA supervision, and control system.

Related projects to eHouse

eHouse 33kV for BESS in Lancashire

Chorley (United Kingdom)

Design, construction and delivery of an eHouse destined to the BESS systems connected to a photovoltaic plant in Chorley, Lancashire (UK), with the aim of powering the local grid.

HV/MV Mobile Substation 69-34.5/13.8-11.95kV 30MVA

Rio de Janeiro (Brazil)

This important project includes the study, design, construction and supply of a mobile substation 69-34,5/13,8-11,95kV 30MVA for Enel Group, addressed to Rio de Janeiro (Brazil).