N. 4 MV E-Houses 23kV for electrification of rural areas

Gonaives e Cabo Haitiano (Haiti)

Country

Haiti

Year

2006

Description

The project has included n. 4 compact substations, with the aim to supply the electricity in the rural areas of Gonaives and Cabo Haitiano.

It has involved the study, construction, and supply of n. 4 STC-Box compact substations, each containing n. 10 medium-voltage (MV) metal enclosed ATR switchgear cubicles 23kV 630A 25kA (1s), with a frequency of 60Hz, current transformers, SCADA supervision, and control system.

Related projects to eHouse

MV E-House 17.5kV for floating solar plant

Alqueva (Portugal)

Study, design, and construction of an IP54 2×2.5MVA E-House, STC-Box, destined for the floating solar system in Alqueva, Portugal.

N. 2 MV E-House 24kV and 36kV for photovoltaic plant

Assemini, Loc. Macchiareddu (Italy)

The project was carried out in an electrical substation for the delivery of high voltage (HV) power, situated inside a photovoltaic plant, in one of the most important industrial centres of the southern Sardinia.