MV E-House 13.8kV for electrical grid
Puerto Cabello (Venezuela)
Country
Year
Description
The project has included modular shelters and medium and low-voltage switchgears, for the modernization of generators in Venezuela.
N. 22 modular shelters STC-Box equipped with:
- N. 159 medium-voltage (MV) metal-enclosed ATR switchgear cubicles 13.8kV 630A 40kA 60Hz;
- N. 39 low-voltage (LV) Euro-SDS switchboards;
- Accessories and replacement materials.