Metal-Enclosed ATR Switchgear 34.5kV 630A 16kA

Panama City (Panama)

Country

Panama

Year

2015

Description

The project was carried out in Panama City, with the aim of increasing the electrification grid.

It has included the study, construction and supply of medium-voltage (MV) metal-enclosed ATR switchgears 34.5kV 630A 16kA with a frequency of 60Hz.

Related projects

MV Switchgears 6,3kV 2000A 25kA for Thermoelectric Power Station

Nuevitas (Cuba)

The project had been carried out in the tourist area of Nuevitas, in the province of Camagüey and it has included the renewal of the thermoelectric power station.

MV E-House 36kV for photovoltaic system

Macchiareddu, Cagliari (Sardinia)

Plug-in electrical substation, connected to a large photovoltaic system in the industrial district of Macchiareddu (Sardinia), for the implementation of the electrical grid.