MV E-House 36kV for electrical grid

Tripoli (Libya)

Country

Libya

Year

2017

Description

The project has included the design and construction of n. 3 compact STC-Box substations, aiming to increase electrification in Libya.

Three compact modular substations, two of which with a power of 36kV 1250A 25kA and the other 4.16kV 1250A 25kA, consisting of:

  • Nr. 5 medium-voltage Normal Clad switchgear columns 36kV
  • Nr. 3 medium-voltage metal-enclosed ATR switchgear columns 4,16kV
  • Nr. 1 low-voltage (LV) Euro-SDS switchgear
  • Nr. 1 low-voltage(LV) Euro-480V switchgear
  • Spare parts

Related projects to eHouse

MV EHOUSE 33kV 25MVA AND 49,5MVA FOR BATTERY ENERGY STORAGE SYSTEM

Luton (United Kingdom)

The project consists in the design, manufacturing, and commissioning of an eHouse in the Chapel farm plant 49,5MW/99MWh near Luton (UK), connected to the Tesla Battery Energy Storage System (BESS).

N. 2 Transformation cabins and n. 2 switching stations for PV greenhouses

Oristano (Italy)

The project includes the design, manufacturing, and supply of n. 2 Transformation Cabins STC-Box and n. 2 Delivery Cabins for two photovoltaic greenhouse plants, in Oristano (Sardinia).