68MW BESS plant in Shetland Islands

Shetland Islands

Country

United Kingdom

Year

2025

Description

Design, manufacture and supply of eHouses for BESS plant 68 MW. The battery will contribute to cutting emissions and utilising more renewables on the islands.

For this remote and beautiful area, we have studied, designed manufactured and supplied:
- N. 1 main switchroom 33kV, equipped with medium voltage air-insultaed switchgear, protection panels, HVAC systems, fire detection and automatic extinguisher system, inverter and UPS 110VDC.
- N. 1 control room, equipped with low votlage switchboard, protection panels, HVAC system, fire detection and automatic exhstinguisher system, inverter and UPS 230VAC, marshalling panel, interface panels. - N. 2 LV AC rooms, equipped with low votlage switchboard, protection panels, HVAC system, fire detection and automatic exhstinguisher system, inverter and UPS, marshalling panel, interface panels.
The greatest challenge of this project was the transport, especially the docking in a port not used to receive large cargos. We are proud to have successfully delivered the eHouses. Credit picture landscape: Zenobē Energy Ltd

Related projects to eHouse

eHouse 12kV for hydrogen system

West Yorkshire (United Kingdom)

We have designed, constructed and supplied a compact eHouse solution, fully equipped with cutting-edge medium-voltage (MV) electrical switchgear and tailored to meet the specific requirements of the client.

MV E-House 36kV for desert areas

Bordj Omar Drisse, El Goléa, Talmine, Tindouf, Djanet, Timiaouine (Algeria)

This project was carried out in Algeria and localised in six sites. It consists of modular shelters, which are sized and structured in order to withstand the severe desert conditions.