68MW BESS plant in Shetland Islands
Shetland Islands
Country
Year
Description
Design, manufacture and supply of eHouses for BESS plant 68 MW. The battery will contribute to cutting emissions and utilising more renewables on the islands.
For this remote and beautiful area, we have studied, designed manufactured and supplied:
- N. 1 main switchroom 33kV, equipped with medium voltage air-insultaed switchgear, protection panels, HVAC systems, fire detection and automatic extinguisher system, inverter and UPS 110VDC.
- N. 1 control room, equipped with low votlage switchboard, protection panels, HVAC system, fire detection and automatic exhstinguisher system, inverter and UPS 230VAC, marshalling panel, interface panels.
- N. 2 LV AC rooms, equipped with low votlage switchboard, protection panels, HVAC system, fire detection and automatic exhstinguisher system, inverter and UPS, marshalling panel, interface panels.
The greatest challenge of this project was the transport, especially the docking in a port not used to receive large cargos. We are proud to have successfully delivered the eHouses.
Credit picture landscape: Zenobē Energy Ltd
Related projects to eHouse
N. 3 e-Houses for agrivoltaic plants
Naples
N. 3 switchrooms for the agrivoltaic park in Giugliano (Naples), with a total nominal power of 86.63 MW and an annual clean energy production of over 130 GWh. This will supply electricity to 48,000 households, avoiding the emission of more than 60,000 tons of CO₂ and improving crop yield and productivity.
Photovoltaic 86.16MWp
Monreale (Italy)
Project for the photovoltaic plant in Monreale (Palermo), with a capacity of 86.16 MWp.
