68MW BESS plant in Shetland Islands

Shetland Islands

Country

United Kingdom

Year

2025

Description

Design, manufacture and supply of eHouses for BESS plant 68 MW. The battery will contribute to cutting emissions and utilising more renewables on the islands.

For this remote and beautiful area, we have studied, designed manufactured and supplied:
- N. 1 main switchroom 33kV, equipped with medium voltage air-insultaed switchgear, protection panels, HVAC systems, fire detection and automatic extinguisher system, inverter and UPS 110VDC.
- N. 1 control room, equipped with low votlage switchboard, protection panels, HVAC system, fire detection and automatic exhstinguisher system, inverter and UPS 230VAC, marshalling panel, interface panels. - N. 2 LV AC rooms, equipped with low votlage switchboard, protection panels, HVAC system, fire detection and automatic exhstinguisher system, inverter and UPS, marshalling panel, interface panels.
The greatest challenge of this project was the transport, especially the docking in a port not used to receive large cargos. We are proud to have successfully delivered the eHouses. Credit picture landscape: Zenobē Energy Ltd

Related projects to eHouse

Normal Clad switchgear for electrical power grid

Latin America

Design, manufacturing and supply of n. 24 MV AIS Normal Clad cubicles 13.8kV 2500A 25kA equipped with our wireless and battey-less PR.E.SE. (PRedictive Electrical SEnsors), Power transformers 110kV/34,5kV 28/40MVA with ONAN/ONAF, Power Transformer Protection panel, and customized SCADA system.

N. 2 Transformation cabins and n. 2 switching stations for PV greenhouses

Oristano (Italy)

The project includes the design, manufacturing, and supply of n. 2 Transformation Cabins STC-Box and n. 2 Delivery Cabins for two photovoltaic greenhouse plants, in Oristano (Sardinia).