N. 4 MV switchrooms 33kV and 1 control room for BESS
Norwich (United Kingdom)
Country
Year
Description
We have designed, manufactured and supply Ørsted’s first large-scale Battery Energy Storage System (BESS) in the UK.
The project, co-located with the Hornsea 3 Offshore Wind Farm onshore infrastructure near Norwich, will be among the largest battery systems in Europe:
- Power rating: 300 MW
- Energy capacity: 600 MWh (≈ 2 hours nominal duration)
- Shared grid connection with offshore wind for optimized efficiency
- MV AIS switchgear 36kV
- LV panels for protection and monitoring
- Patch panels & Roxtec cabling systems
- 4G antenna, weather station, GPS
- Swicom
- Fire detection system
- HVAC
- Human interface panels
Related projects to eHouse
Photovoltaic 86.16MWp
Monreale (Italy)
Project for the photovoltaic plant in Monreale (Palermo), with a capacity of 86.16 MWp.
N. 2 Transformation cabins and n. 2 switching stations for PV greenhouses
Oristano (Italy)
The project includes the design, manufacturing, and supply of n. 2 Transformation Cabins STC-Box and n. 2 Delivery Cabins for two photovoltaic greenhouse plants, in Oristano (Sardinia).
