eHouse for BESS in Serramanna station
Cagliari (Italy)
Country
Year
Description
We have designed and manufactured a switchroom that will manage the power distribution from a 40MW photovoltaic plant and a 17MW BESS system on a surface of 51 hectares at Serramanna station in Cagliari.
This unit is equipped with:
- MV switchgear ATR 30kV 1250A 25kA(1s)
- LV switchboard Euro-SDS
- SCADA panel
- Firefighting system & HVAC
The plant will have a total capacity of 38.79 MWp, divided into two subfields equipped with single-axis tracking structures. The project includes integration with a 17 MW electrochemical storage system, which will help stabilize production and optimize grid injection. Overall, the maximum expected injection into the National Transmission Grid (RTN) will be 33MW.
Related projects to eHouse
HV/MV Mobile substation 115/37.5/10.5kV 10MVA
Udënisht, Korçë (Albania)
The project has included design, installation and supply of a mobile substation in Udënisht, a well-known touristic area, in Korçë, and the sixth most important town in Albania.
HV/MV Mobile Substation 110/20kV 40MVA
Fushë-Krujë (Albania)
Development and supply of a mobile substation 110/20kV for transformation and primary distribution 40MVA, carried out in the geographical area of Fushë-Krujës. It involves the supply of electricity for the benefit of a population of over 40,000 inhabitants.