eHouse for BESS in Serramanna station
Cagliari (Italy)
Country
Year
Description
We have designed and manufactured a switchroom that will manage the power distribution from a 40MW photovoltaic plant and a 17MW BESS system on a surface of 51 hectares at Serramanna station in Cagliari.
This unit is equipped with:
- MV switchgear ATR 30kV 1250A 25kA(1s)
- LV switchboard Euro-SDS
- SCADA panel
- Firefighting system & HVAC
The plant will have a total capacity of 38.79 MWp, divided into two subfields equipped with single-axis tracking structures. The project includes integration with a 17 MW electrochemical storage system, which will help stabilize production and optimize grid injection. Overall, the maximum expected injection into the National Transmission Grid (RTN) will be 33MW.
Related projects to eHouse
N.2 MV E-House 33kV 50MVA for Tesla Battery Energy Storage System
Yorkshire (United Kingdom)
Design, construction and supply of n. 2 switching stations equipped with power transformers, MV air-insulated ATR switchgear 36kV 1250A 20kA (1s), LV switchboards, and a SCADA system for the remote control, destined to Tesla BESS (Battery Energy Storage System).
MV E-House 13.8kV for electrical grid
Puerto Cabello (Venezuela)
The project has included modular shelters and medium and low-voltage switchgears, for the modernization of generators in Venezuela.