eHouse for BESS in Serramanna station
Cagliari (Italy)
Country
Year
Description
We have designed and manufactured a switchroom that will manage the power distribution from a 40MW photovoltaic plant and a 17MW BESS system on a surface of 51 hectares at Serramanna station in Cagliari.
This unit is equipped with:
- MV switchgear ATR 30kV 1250A 25kA(1s)
- LV switchboard Euro-SDS
- SCADA panel
- Firefighting system & HVAC
The plant will have a total capacity of 38.79 MWp, divided into two subfields equipped with single-axis tracking structures. The project includes integration with a 17 MW electrochemical storage system, which will help stabilize production and optimize grid injection. Overall, the maximum expected injection into the National Transmission Grid (RTN) will be 33MW.
Related projects to eHouse
Energy and agriculture in synergy with our eHouse
Montalto di Castro (Italy)
We have studied, designed, manufactured and supplied a connection cabin, eHouse, intended for the Guinza Grande plant in Montalto di Castro, Viterbo.
MV E-Houses 36kV for diesel power plant
Naypyidaw (Myanmar)
The project was carried out in the capital of Myanmar and it has allowed an increase in the supply of electricity in diesel power plants.