CONTROL ROOM EHOUSE FOR BESS 100MW 200MWh
North Yorkshire (United Kingdom)
Country
Year
Description
We designed, constructed and supplied an eHouse control room, carried out for Tesla and addressed to the Lakeside Battery Energy Storage System, in Drax, North Yorkshire (UK).
This advanced energy facility boasts a capacity of 100MW and 200MWh, representing a significant leap forward in energy management and distribution.
The STC-Box control room is equipped with the following state-of-the-art systems and equipment:
- HVAC and fire detection systems
- HV protection panel
- LV Euro P&C panels
- Marshalling panel
- Mimic panel
- RTU panel and 4G antenna
Related projects to Transformation cabin
STC-Skid transformation cabins 4,8MVA
Padua (Italy)
Design, manufacturing and commissioning of plug-in Skid transformation cabins destined for a photovoltaic plant in the beautiful location of Monselice (Padua).
N. 4 Transformation cabins for photovoltaic systems 3.15MW
Pontinia and Montalto (Italy)
Design, construction and commissioning of plug-in compact substations STC-Kiosk for 3.15MW photovoltaic systems in Pontinia and Montalto (Latina).