CONTROL ROOM EHOUSE FOR BESS 100MW 200MWh

North Yorkshire (United Kingdom)

Country

United Kingdom

Year

2024

Description

We designed, constructed and supplied an eHouse control room, carried out for Tesla and addressed to the Lakeside Battery Energy Storage System, in Drax, North Yorkshire (UK).

This advanced energy facility boasts a capacity of 100MW and 200MWh, representing a significant leap forward in energy management and distribution.
The STC-Box control room is equipped with the following state-of-the-art systems and equipment:

  • HVAC and fire detection systems
  • HV protection panel
  • LV Euro P&C panels
  • Marshalling panel
  • Mimic panel
  • RTU panel and 4G antenna
With these features, our eHouse Control Room supports efficient energy management and ensures the highest levels of safety and reliability.

Related projects to Transformation cabin

EHOUSE FOR WATER TREATMENT PLANT

Arezzo (Italy)

We have designed and manufactured a 1600kVA STC-Kiosk transformer cabin

STC-Skid transformation cabins 20kV

Rovigo (Italy)

The project consists of n. 6 STC-Skid transformation cabins 7.2MW addressed to a photovoltaic system in Rovigo (Italy).