N. 4 Power Transformers 40.7MVA in total

Tiranë (Albania)

Country

Albania

Year

2016

Location
Description

The project has been carried out in Albania, in collaboration with the local company OSHEE.

The project has included n. 4 transformers with the following characteristics:

  • 20/25 MVA transformer immersed in three-phase liquid, 115 ± 2x2.5% / 6.3 kV
  • 10 MVA transformer immersed in three-phase liquid, 115 ± 2x2.5% / 38.5 ± 2x2.5%/10.5 kV
  • 7.5 MVA transformer immersed in three-phase liquid, 35 ± 2x2.5% / 10.5 kV
  • 10 MVA transformer immersed in three-phase liquid, 35 ± 2x2.5% / 6.3 kV
in order to increase the power of electrical substations

Related projects

MV E-House 20kV for Tesla Battery Energy Storage System

West Sussex (United Kingdom)

Engineering study, design, construction, and supply of n. 1 compact substation STC-Box for a Tesla project in West Sussex (UK).

N. 2 Transformation cabins and n. 2 switching stations for PV greenhouses

Oristano (Italy)

The project includes the design, manufacturing, and supply of n. 2 Transformation Cabins STC-Box and n. 2 Delivery Cabins for two photovoltaic greenhouse plants, in Oristano (Sardinia).