The project has been carried out in Albania, in collaboration with the local company OSHEE.

The project has included n. 4 transformers with the following characteristics:

  • 20/25 MVA transformer immersed in three-phase liquid, 115 ± 2x2.5% / 6.3 kV
  • 10 MVA transformer immersed in three-phase liquid, 115 ± 2x2.5% / 38.5 ± 2x2.5%/10.5 kV
  • 7.5 MVA transformer immersed in three-phase liquid, 35 ± 2x2.5% / 10.5 kV
  • 10 MVA transformer immersed in three-phase liquid, 35 ± 2x2.5% / 6.3 kV
in order to increase the power of electrical substations

Related projects

eHouse for Continosa PV and wind plant 90MVA

Macchiareddu (Italy)

Design, manufacture, and supply of our eHouse, the Switching Station STC-Box for the in the Continosa photovoltaic (PV) and wind park 90MVA, within the industrial area of Macchiareddu (Sardinia).

E-Houses for BESS 100MW and 50MW-200MWh

Lakeside (UK) and Belgium

eHouse addressed to Tesla BESS plants 100 MW in Lakeside and 50MW-200MWh for Eneco, in Belgium.