N. 4 Power Transformers 40.7MVA in total

Tiranë (Albania)

Country

Albania

Year

2016

Location
Description

The project has been carried out in Albania, in collaboration with the local company OSHEE.

The project has included n. 4 transformers with the following characteristics:

  • 20/25 MVA transformer immersed in three-phase liquid, 115 ± 2x2.5% / 6.3 kV
  • 10 MVA transformer immersed in three-phase liquid, 115 ± 2x2.5% / 38.5 ± 2x2.5%/10.5 kV
  • 7.5 MVA transformer immersed in three-phase liquid, 35 ± 2x2.5% / 10.5 kV
  • 10 MVA transformer immersed in three-phase liquid, 35 ± 2x2.5% / 6.3 kV
in order to increase the power of electrical substations

Related projects

eHouse 33kV for PV plant expansion

Viterbo (Italy)

We have designed, manufactured and supplied an eHouse intended for the expansion of the photovoltaic plant in Montalto di Castro, Italy.

HV/MV Mobile substation 115/37.5/10.5kV 10MVA

Udënisht, Korçë (Albania)

The project has included design, installation and supply of a mobile substation in Udënisht, a well-known touristic area, in Korçë, and the sixth most important town in Albania.