N. 4 MV E-Houses 34.5kV for industrial area

Havana (Cuba)

Description

The project was addressed to the developing industrial center of Artemisa and included the engineering study, construction, and commissioning of compact substations for energy distribution and electrical equipment for the substation interconnection.

In details, it has involved n. 4 pre-assembled and modular compact substations STC-Box, containing n. 4 SCADA systems for the plant control, supervision, and data acquisition, gas-insulated (GIS) medium-voltage (MV) switchgears ATR-Ring 34.5kV 16kA 630A, Low-voltage switchboards RTU and Euro SDS for the control and supervision of the plant, power transformers, and interconnection cables.
Moreover, in order to address the energy supply, the STC-Box electrical substations are connected to:

  • N. 8 pre-assembled and modular STC-Kiosk with ring configuration 34.5kV 300kVA 500A
  • N. 8 pre-assembled and modular STC-Kiosk with ring configuration 34.5kV 630kVA 1000A
  • N. 8 pre-assembled and modular STC-Kiosk with ring configuration 34.5kV 1000kVA 1500A
  • N. 10 pre-assembled and modular STC-Kiosk with ring configuration 34.5kV 100kVA 300A
  • N. 4 pre-assembled and modular STC-Kiosk with ring configuration 34.5kV 100kVA 200A for public lighting

Related projects to eHouse

MV E-House 36kV for Artemisa development area

Artemisa (Cuba)

Designed, construction and supply of n. 2 modular, pre-assembled and fully tested STC-Box cabins, for the expansion of a power plant serving the industrial area of Artemisa, in Cuba.

MV E-House 34.5kV for industial district

Artemisa (Cuba)

The project, carried out in the industrial district called “National Center” located in Artemisa, has consisted of the supply of materials, products and systems, for the installation of medium-voltage distribution STC-Box shelters.