MV Trasnformation cabin 36kV for rural areas
Kinshasa (Congo)
Country
Year
Description
The project has included the installation of a prefabricated compact substation for the electrification of Congolese rural areas.
Design, construction and commissioning of a compact substation 36kV 630A 16kA, made up of a shelter STC-kiosk, low-voltage (LV) switchgears, medium-voltage switchgear ATR and power transformer.
Related projects to Transformation cabin
EHOUSE FOR WATER TREATMENT PLANT
Arezzo (Italy)
We have designed and manufactured a 1600kVA STC-Kiosk transformer cabin
EHouse and n. 4 transformation cabins for Photovoltaic plant
Macchiareddu (Italy)
Project realised in Macchiareddu, within a photovoltaic park in Sardinia in one of the most important industrial hubs. This is an area of development increasingly powered by alternative energy, where CR Technology Systems has already been present for some years in the realisation of green projects in the area.