MV Trasnformation cabin 36kV for rural areas

Kinshasa (Congo)

Country

Congo

Year

2016

Description

The project has included the installation of a prefabricated compact substation for the electrification of Congolese rural areas.

Design, construction and commissioning of a compact substation 36kV 630A 16kA, made up of a shelter STC-kiosk, low-voltage (LV) switchgears, medium-voltage switchgear ATR and power transformer.

Related projects to Transformation cabin

EHouse and n. 4 transformation cabins for Photovoltaic plant

Macchiareddu (Italy)

Project realised in Macchiareddu, within a photovoltaic park in Sardinia in one of the most important industrial hubs. This is an area of development increasingly powered by alternative energy, where CR Technology Systems has already been present for some years in the realisation of green projects in the area.

Renewable for Africa – Ivory Coast

Abidjan (Ivory Coast)

The project was carried out thanks to the donation offered to the government of the Ivory Coast, to provide power to a photovoltaic system, used for the extraction and purification of groundwater.