MV Normal Clad switchgears for steelwork plant

Hatay (Turkey)

Country

Turkey

Year

2022

Description

N. 2 air-insulated (AIS) medium-voltage (MV) Normal Clad electrical switchgears (14 cubicles) 12kV 1250A 31.5kA (25kA arc-resistant) equipped with a gas outlet duct, relays, VA VT, and circuit-breakers. The project, commissioned by our Swiss client, is addressed to a steelwork plant in Turkey.

Related projects

MV E-House 24kV for photovoltaic plant

Trecate (Italy)

Tailor-made project for the implementation of electrical equipment interconnected to the new photovoltaic system in Trecate (Novara), committed to us by a large company in the oil & gas field, which will provide green energy to a refinery plant.

EHouse and n. 4 transformation cabins for Photovoltaic plant

Macchiareddu (Italy)

Project realised in Macchiareddu, within a photovoltaic park in Sardinia in one of the most important industrial hubs. This is an area of development increasingly powered by alternative energy, where CR Technology Systems has already been present for some years in the realisation of green projects in the area.